Hôpital de Vaudreuil-Soulanges
A hospital designed with you in mind. Accessible, welcoming, people-centred and modern, the future Hôpital de Vaudreuil-Soulanges is being designed around the needs of patients, their loved ones and the teams who will work there.
Located in Vaudreuil-Dorion, at the intersection of Boulevard de la Cité-des-Jeunes and Autoroute 30, the hospital is currently under construction. Construction is expected to be completed in 2027, with the hospital scheduled to gradually open beginning in summer 2028.
An investment of $2.6 billion;
Expected capacity of 404 beds;
Emergency department with 41 stretchers;
Operating suite with 11 operating rooms;
Le capital humain
Avec 3 500 employés, 250 médecins et 250 bénévoles à recruter, des moyens extraordinaires sont requis afin d’attirer de nombreux talents. Plusieurs campagnes de promotion sont à venir !
Une participation importante aux salons d’emplois, ainsi qu’aux initiatives en matière d’employabilité dans Vaudreuil-Soulanges, sont aussi des éléments-clés.
Nous soutenons également le déploiement de formations académiques sur le territoire de Vaudreuil-Soulanges, en collaboration avec nos partenaires de l’éducation, autant au niveau professionnel que collégial.
Des nouvelles du projet
Info-travaux
Dès le 5 octobre : fermetures de soir et de nuit sur l’autoroute 30 et la route 340
Fermetures complètes de nuit sur l’autoroute 30 les 20, 21 et 22 août
Fermeture des bretelles de l’A-30 en direction est | 7 au 10 août
Fermeture complète d’une portion du boulevard de la Cité-des-Jeunes dès le 2 août
19 juin à la fin août : fermeture complète sur la route 340 et dans une bretelle de l’autoroute 30, en direction ouest
Fermeture complète de bretelles de l’autoroute 30 à la hauteur de la route 340
Entraves sur l’autoroute 30 à prévoir du 22 au 25 mai
Circulation en alternance sur la route 340 du 1er au 4 mai
24 au 27 avril : fermetures de bretelles d’accès de l’autoroute 30, à la hauteur de la route 340
Reprise des travaux de réaménagement de la route 340 à Vaudreuil-Dorion et Saint-Lazare
Entrave majeure sur la route Harwood dès le 13 avril
Fermeture du boulevard de la Gare : période intensive de travaux du 14 au 17 novembre
Experience the hospital as if you were there
Tout ce que vous voulez savoir sur le futur hôpital de Vaudreuil-Soulanges
Frequently asked questions
Why build a hospital in Vaudreuil-Soulanges?
The need for a new hospital is driven by the region’s growing population and evolving healthcare needs. Approved by the Ministère de la Santé et des Services sociaux in 2017, the clinical plan for the future hospital helped identify both current and future healthcare needs within the community. It confirmed the need to develop new hospital services in Vaudreuil-Soulanges to provide more care closer to home and to enhance the range of healthcare services offered by Santé Québec Montérégie-Ouest.
The future hospital will be part of an integrated healthcare network, working in complement with other Santé Québec Montérégie-Ouest facilities and the broader health and social services system.
To learn more, visit this page.
Who is responsible for the future Hôpital de Vaudreuil-Soulanges?
The future Hôpital de Vaudreuil-Soulanges is led jointly by Santé Québec Montérégie-Ouest and the Société québécoise des infrastructures (SQI). Each organization plays a distinct yet complementary role, working together to successfully deliver the project.
Members of both organizations are brought together within the project office, located at 2505 chemin de la Petite-Rivière in Vaudreuil-Dorion.
Where will the hospital be located?
The site is located at the intersection of Autoroute 30 and Route 340, just off Autoroute 40, in Vaudreuil-Dorion.

The Ministère de la Santé et des Services sociaux and municipal and regional authorities determined it to be the best place for the new hospital in terms of size, location and access.
How will the hospital be activated?
The hospital’s delivery is scheduled for 2027.
Following the handover, Santé Québec Montérégie-Ouest will begin the hospital’s technical and clinical activation. This essential phase will involve preparing the facilities, equipment and teams to welcome the first patients.
The hospital will open gradually, allowing teams to prepare and ensuring a planned and safe transition to operations. The first patient is expected to be welcomed in summer 2028.
Further information about the steps leading to the hospital’s opening will be shared as the project progresses.
Who will build the hospital?
The Société québécoise des infrastructures will act as project manager. Pomerleau is the general contractor for the hospital construction project.
Combien de nouveaux employés, gestionnaires et médecins seront requis pour le nouvel hôpital ?
On estime que 3 500 employés, 250 médecins et 250 bénévoles seront requises pour le nouvel hôpital.
Des démarches d’attraction et de rétention sont déjà en cours en vue de combler les besoins de main-d’œuvre du futur hôpital, toujours en s’assurant de maintenir l’équilibre avec nos milieux actuels.